International forum
“Marine Industry of Russia”
Moscow, “Gostiny Dvor”
Exhibition Hall,
May 23-25, 2012

Time left till opening of the Forum:

0 days 18 hours 51 minute

 
Electronic catalogue

The Ministry of Transportof the Russian Federation FGU «Rostransmodernizatsiya»

General information partners

Sudprom.ru News on Shipbuilding, Ship-Repair, Navigation and Russian Fleet Operation

Морская политика России

Nizhegorodsky Teplokhod Plant Won the Bid

March 04, 2010

The Nizhegorodsky Teplokhod Plant (ZNT), OJSC, won the open tender held by the Saint-Petersburg branch of FGUP Rosmorport for the power to effect a government contract for developing a detailed design and executing works to construct a buoy vessel.

The powerboat is a steel single-deck self-propelling double-screw vessel with a forecastle bulkhead, flat transom-type stern and sternmost propeller guards, foremost working deck for simultaneous placement of 4 buoy БМБЛ-78 with mooring devices, with main engines and deck-house accommodation at aft and with a cargo crane.

Main dimensions:
Climatic conditions:
From to +35

  • Overall length – 42 m,
  • Extreme beam (including breasting dolphins) – 10.2 m,
  • CWL DWT – 221 t,

С;С to +25 С.
outside air temperature from -30 C.
water temperature from -2 C.
Designers: ZNT, OJSC, and MDB, OOO.

Source: http://www.korabel.ru

Read also:

 
 

© Marine Industry of Russia, 2009-2010. All rights reserved.

By: “Ideological buiseness-projects”

Design by Valentina Ivanova.