VII International forum
“Marine Industry of Russia”
Hotel complex
«President-Hotel»
Department of affairs of the President of the Russian Federation

Moscow, 24, B.Yakimanka Str
24-25 May 2017
 
Forum bulletin


SEFDR Arkticheskaya

August 09, 2010

In the Pechora Sea construction operations of the self-elevating floating drilling rig (SEFDR) Arkticheskaya reached its final stage. The rig is designated for exploration and production drilling of oil and gas wells of down to 6,500 m depth with sea depth from 10 to 30 m.

This non-propelled SEFDR has three frame supports, fore accommodation block, helicopter deck and drilling unit located on the aft pull-out beam.

The completion of works will be followed by dock trials.

Read also:

 
 
Яндекс.Метрика

© Marine Industry of Russia, 2009-2010. All rights reserved.

By: “Ideological buiseness-projects”

Design by Valentina Ivanova.